Sunday, July 10, 2022

UP's 4-8-4 Locos in Victorville, and Laying a Tangle of Turnouts in Staging

This time we'll take a look at UP's 4-8-4 steam locos while they were running through Victorville in 1946-1948.  Then we'll look at my slow layout progress as I encountered a whole tangle of mainline turnouts in Section 8 of the staging deck.

The Union Pacific had three classes of 4-8-4 Northern-type steam locos: the FEF-1 class was built in 1937 (#800-819); the FEF-2 class was built in 1939 (#820-834); and the FEF-3 class was built in 1944 (#835-844).  They were all converted to burn oil before they appeared on Cajon Pass and in Victorville starting in March, 1946. 

They were normally assigned to pull the secondary, heavyweight passenger trains, and they sometimes needed helpers, usually UP 4-8-2s.

Here we see FEF-1 #813 in Nebraska in March, 1950 (after leaving California), thanks to Jack Pfeiffer:


But the FEF-1 locos were rarely seen on Cajon Pass, judging from the lack of photos.  Here is one AAR photo showing #814 during the rail stress tests at Cajon in Nov. 1947:


Note the two-tone gray paint scheme on the above locos.  But when the UP 4-8-4s first arrived in March of 1946, they were all still black.  Starting in May, a few got two-tone gray with silver stripes and lettering, and starting in December, most or all of them gradually got two-tone gray with yellow stripes and lettering.  

They left Cajon Pass in July of 1948, except for rare appearances in 1949 and maybe 1950, and they did not return during the UP's 1950-1951 one-year return to steam.

Let's look at some FEF-2 photos now.   Here we see #820 with the westbound LA Limited at Cajon station in Sep. 1946, thanks to H.L. Kelso:

 

Here's a nice shot of #821 with Train 43 at the San Bernardino depot in late 1946, as seen by James N. Spencer:

 
Here comes #830 with an eastbound train, climbing toward Sullivan's Curve in Sep. 1947, thanks to Robert F. Collins:


The 4-8-4s were sometimes seen with a helper, usually a 4-8-2.  Here #2711, a 2-8-2 helper from Victorville, has cut off from the front of #831 on the westbound LA Limited at Summit in May, 1947, as seen by Walt Thrall:

 

Turning now to the FEF-3 class, these locos looked different, as they had their "wind wings" (smoke lifters) added in 1946, while the earlier classes didn't get any until 1950.  All the classes got a Mars light by May of 1947.

Here is #836 climbing westbound from Victorville through Frost with the short-lived Transcon in June of 1946:

 

Here is #840 with the westbound Transcon at San Bernardino in the summer of 1946:

 

The westbound Transcon behind #835 was in a deadly wreck in the Lower Narrows of Victorville on Sep. 26, 1946, as seen here:

Here's a beautiful action shot of #843 with the 2nd section of the eastbound Utahn at Pine Lodge in Feb. 1949 (a rare appearance after July, 1948), thanks to James Ady:

 

Here's the final loco in the FEF-3 class, #844, during the rail stress tests at Cajon in Nov. 1947:


Let's look at some of the many HO models of UP 4-8-4s now.  I don't have an FEF-1 (they were rarely seen on Cajon), but PFM made a model:


Overland Models also made an FEF-1:


I do have a Westside brass FEF-2, but it isn't painted yet, and I think it should be painted black, as I don't have a black UP 4-8-4 yet, like this one:


I have an Athearn Genesis FEF-2 in two-tone gray with yellow trim, as seen here:

Westside also made a brass FEF-2:


 Key also made a brass FEF-2:


I have two Athearn Genesis FEF-3 models, both in two-tone gray, one with silver trim and one with yellow trim.  For example, here's one with yellow trim:


Broadway Limited also made the FEF-3 locos, such as this one:


And Rivarossi made an FEF-3 long ago:


I'll skip the many brass FEF-3 models, which I don't have.

My layout progress slowed down a lot when I got to the tangle of turnouts on the mainlines as they approached the end of Section 8 and the start of Section 9 in staging.  First I had to finish painting the edges of the cork roadbed for the sidings, as some of the turnouts sit partly on those areas.

I had to cut and fit some short pieces of track to connect some of the turnouts together.  Here's a "before" view with some of the turnouts in place but not yet connected:


Note the three turnouts at the left end, where two of the Atlas switch machines wanted to occupy the same space, so I've moved the upper one to the other side of its throw-bar, where it will be glued to its roadbed pad there.

After I cut and fit the two one-inch track pieces to fill the gaps seen above, the trackage looked like this, as seen from the other side of the benchwork:



I used a felt-tip pen to mark where each rail should be cut, and I used a push-pin to open each rail joiner a bit and to push the joiner onto the rail, which worked very well.

Then I propped this whole assembly partly into the air and spread some caulk onto the roadbed, except where the moving parts of the turnouts would be.  I laid the tracks down into the caulk, pinned them in place with push-pins, slid loose ties under the rail joiners, and added weights (food cans) until the caulk dried.

Now I had to cut and fit three more pieces of flextrack to close the gaps between these turnouts and the next ones along the mainlines in Section 9.  Then these tracks were laid down into new caulk, the alignments were checked, loose ties were added, and weights were added again until dry.

I also cut and fit and painted some inverted cork roadbed pieces to slide under the switch machines to support them.

Here's the current state of these tracks, looking from Section 8 toward the next section (Section 9) in the staging room:


And here's a view from the opposite direction, looking back towards Section 8:



Now that I'm past that tangle of turnouts, it should be clear sailing around the mainline loops in the staging room.  But it may be three weeks before my next blog entry, due to some vacation time coming up.

 

 



Sunday, June 26, 2022

Santa Fe's First Freight F3-F7 Diesels in Victorville, and Laying More Mainline Tracks in Staging

Our Victorville locomotive type this time is the first group of freight F7s that Santa Fe bought, along with their two sets of freight F3s.  My layout progress is slow but steady, as I lay more flextracks along the staging mainlines each week.

Let's begin with Santa Fe's only freight F3s -- two ABBA sets, #200-201, built in Oct-Nov. 1948.  These were late F3s (Phase 4) and looked almost the same as the first F7s, except for having dynamic brake slits instead of a fan on the roof.  They came in the creamy yellow catwhisker paint scheme of the time.

The F3s and F7s began replacing the FTs as the mainline freight engines over Cajon Pass.  Here we see F3 set #200 exiting the San Bernardino B Yard eastbound in Dec. 1948, thanks to Stan Kistler:

After the two freight F3 sets, next came the freight F7s, also in the creamy yellow catwhisker paint scheme.  Sets #202-207 arrived in June-July 1949, sets #208-211 arrived in Sep. 1949, sets #212-226 arrived in Nov-Dec. 1949, and sets 227-232 arrived in March, 1950.  These were all "Phase 1 Early" F7s with 36" dynamic brake fans, and they were all ABBA sets.

Here we see #206 climbing west from Victorville to Frost in Oct. 1950, as shot by Frank Peterson:

Here is set #226 approaching Victorville westbound through the bridges in the Lower Narrows in April, 1950, thanks to Joseph Lynch:


Jack Whitmeyer shot #204 (without its trailing cab unit) with an eastbound freight leaving the B Yard in San Bernardino in Sep. 1949:


Here's another shot of #206, this time descending Cajon Pass with a westbound freight at Keenbrook, thanks to Chard Walker:


Stan Kistler shot #222 climbing westbound from Victorville through Lugo in Oct. 1950:


Here comes #220, climbing eastbound to Summit, as shot by Thomas Hotchkiss:


Finally, here's a nice roof shot of #231 entering Summit in May, 1954, thanks to Fred Scott.  Note how the yellow paint curved across the cab roof:


These units all continued to operate over Cajon Pass and through Victorville during the 1950s.  The creamy yellow paint was gradually replaced by chrome yellow during 1951-1953 (but it's often hard to see the difference in photos), and during 1954-1957 the catwhiskers were gradually replaced with the cigar band paint scheme, which we'll save for another time.

As for HO models, I have one Stewart ABBA set of Phase 4 F3s in catwhiskers, as seen here:

 

I see that Athearn Genesis also made a model of this F3 (note the dynamic brake slits on the rooftop, behind the horns).  But none of these models should have the "Santa Fe" lettering on the sides of the B units:


Looking now at the HO models of Phase 1 Early F7s, I find that I have a couple of ABBA sets from Stewart, as seen here (again, with incorrect "Santa Fe" lettering on the B units):

 


And I found that I have an ABBA set from Athearn Genesis too, like this
(again, with incorrect "Santa Fe" lettering on the B units):


I see that Broadway Limited also made a set, which I don't have:

 

Now let's look at my slow layout progress.  To continue through the mainline turnouts in Section 6A, I first had to paint the cork roadbed for the sidings on each side of the mainlines, so I painted that roadbed the darker shade of light gray that I had used in the staging room over a year ago.  Then I was able to glue down the #8 mainline turnouts (except for the moving parts, of course).

After the first sections of flextrack were attached and glued down beyond those turnouts, that area looked like this (with pushpins in the new tracks):

 


Then I continued around the curves from Section 6A through a bit of Section 2 and into Section 1.  Where the rail joints fell on curves, I first soldered the joints while the track was still straight, as seen here (with wet cotton balls to keep the ties from melting):

I continued by laying more tracks around the curves in Section 1 and into Section 8, first soldering the rail joints that would fall on curves.  Here's a view looking at the new Section 1 tracks after they were laid:


The tracks continued almost to the next group of mainline turnouts in Section 8.  Here's a view from Section 8 looking back at the tracks curving out of Section 1 and approaching the turnouts:


Next week I'll have to deal with this next group of turnouts, and then I can push through into the staging room loop.  This is an enormous project!

A lot of my hobby time also goes into locating all the loco photos to use in these blog entries, and researching the locomotive types and HO models, but I enjoy that.  I've set aside work on the final plans for the Victorville boiler house until a bit later.

On Father's Day weekend, I got to visit nearby Snoqualmie to watch their NP 0-6-0 steam loco running, as seen here:


 I'll be back again in two weeks.

Sunday, June 12, 2022

UP's Early 4-6-6-4s in Victorville, and Laying a Few More Mainline Track Sections

 It's time to cover some Union Pacific steam locos again, so I've chosen their early "Challenger" type 4-6-6-4s.  My layout progress was slower this time, but I'll show you the new mainline track sections that are in place in staging now.

The  UP got two groups of early Challengers: 15 locos in the CSA-1 class in 1936 (#3900-3914), and 25 more in the CSA-2 class in 1937 (#3915-3939).  All of these were converted to oil and renumbered in the 3800-series by 1944,  before my 1946 time period begins.

I like to start with a color photo, so here is #3823 with a freight somewhere on the UP, sometime after 1944:

Note the headlight centered on the smokebox, which is the easiest way to the tell the early Challengers from the later ones, which had their headlight on the pilot.

These locos were in constant use on Cajon Pass (and therefore in Victorville) until mid-1948, when the UP first dieselized that route.   They were used as road engines on freights, as well as serving as helpers on freight and passenger trains.

Here we see #3817 helping 4-8-4 #839 with the westbound LA Limited leaving Victorville in July, 1947, as shot by Chard Walker:


Here's another great shot, this time by Stan Kistler, showing westbound #3837 on the left, meeting eastbound #3836 with a freight
on the right, by the water tanks in Victorville in Nov. 1947:

Here's a nice shot by Jack Whitmeyer, showing #3839 with a westbound freight by the pump houses and water tanks in Victorville:


Here we see #3816 with an eastbound freight at Cajon station in August, 1947, thanks again to Jack Whitmeyer:


 Walt Thrall shot #3827 with an eastbound freight approaching Summit in Feb. 1947, with two steam helpers on the rear:

 

Here is #3823 with an eastbound freight coming through Summit in 1947, as shot by Malcolm Gaddis:

 

This is #3825 rounding Sullivan's Curve with an eastbound freight in March of 1947, thanks again to Malcolm Gaddis.

Here's a color photo of #3800 with a freight, somewhere on the UP:


Finally, here are #3816 and #3817 double-heading with a westbound freight coming into Summit, on their way to be loaned to the SP in June of 1948, as shot by James Ady:

 

As for HO models, I will need a number of these to cover all the UP freights and helper assignments when I'm operating in 1946 through early 1948.

I have two of the Key Imports brass models with oil tenders, painted like this one:


And I have two of the Athearn Genesis models, like this one:

 

But I don't have any of these hybrid ones from Broadway Limited:

Turning now to my slow layout progress over the last two weeks, I continued to glue down (with caulk) a few more sections of flextrack on the mainline curves in Section 6 and then on the straightaways in Section 6A, until I reached the first group of turnouts since I began.

Here's a view of the new track on the curves in Section 6, looking toward Section 6A:

 

And here's a view looking backward to the new tracks on the curve in Section 6, and in the distance, in Section 5:


This week my only addition was cutting and fitting some tracks in Section 6A, up to where the first turnout will be on each main track:


As you can see, I attached Atlas remote switch machines to the mainline turnouts in the distance, but I need to order more of those machines.  I have some Atlas Snap Relays to power the frogs on these #8 turnouts, but I'll need more.

I need to paint the cork roadbed that's off the mainlines a darker gray before I can glue down those turnouts and proceed with more trackage.  There is still a lot of mainline trackage to lay before I complete the loop around the layout, and then comes all the wiring!

Part of each week has been spent corresponding with architect Jim Coady as we try to figure out where all the doors and windows were on the Victorville boiler house, and what their dimensions were.  Here are some recent drawings from Jim, and they are getting very close to being final:


Another large chunk of time each week goes into locating and scanning and labeling and cropping all the prototype photos that I use in each of these blog entries.

That's all for now.